How to lay concrete slabs

The laying of concrete slabs is no problem for every artisan DIY enthusiast. However, you have to be aware of the physically hard work that comes from the weight of the concrete. With a helper you are not only faster, but also protect your health.

Ensure weight stability and drainage

The high weight of the concrete slabs has the advantage that they will be stable and immovable, even if people move or stay on them. It must be remembered that this dead weight must be borne by the subsoil in the long term and errors in the preparation can lead to later sagging of individual or even several concrete slabs.

This risk is also threatened by possible under-flushing, if the water drainage before and during laying was not sufficiently considered. Therefore, a slope - away from the house - both during excavation and laying the concrete slabs must be generated. The bed can be made of sand, gravel or mortar, but in any case must guarantee a high water permeability. Zeichnen Drawing and sorting a plan for a pattern

If you want to lay different colored concrete slabs on the surface, draw a laying plan and calculate the requirements of the individual colors. Prepare for installation by sorting the required stones in the order in which they will later be laid. Any concrete sawing work should be completed before laying. Any cutting edges should always be oriented towards the house, if possible.

Concrete slabs can also be laid with so-called plate bearings. The round plastic plates with a top cross joint form the insert shapes for the individual concrete slabs. This creates a uniform joint strength over the entire surface. The concrete slabs lie loosely in the respective joint corners and can later be removed and replaced individually at any time. The alignment and straightening of the total area is facilitated by the height of each individual plate bearing whose height can be corrected with a rubber mallet.

Step by step instructions

Concrete slabs

  • Gravel, gravel or sand
  • Possibly adhesive mortar
  • Spade and shovel
  • Spirit level
  • Guide and wooden sticks
  • Trowel
  • Scraper bar
  • Rubber mallet
  • Joint crosses
  • 1. Lifting the ground

Depending on the load on the concrete slabs later on the plate bed should be ten to twenty centimeters thick. In addition there is the concrete slab thickness of three to five centimeters. Think of the necessary gradient.

2. Fix the guide to the wooden sticks Holz At each corner of the laying surface, push wooden sticks into the ground and fasten the guide line. For very large areas, also install intermediate cords that take into account the required slope.

3. Laying concrete slabs

Begin laying in one corner and fill in rows by row. Insert the joints between the concrete slabs at the beginning of each new row. Beg 4. Straightening the surface

From the second row, align the newly laid concrete slabs with the rubber hammer and spirit level. Consider general slope of total area.

5. Use joint thickness for compensation

If individual concrete slabs are offset after several rows, use the tolerance of the joints for correction. Use permanent tightening of the already applied surface with the wiper strip to maintain the straightening.

6. Do not fill joints

When laying concrete slabs, leave the joints unfilled. This gives the surface the necessary clearance to compensate for temperature differences and load peaks.

Tips & TricksThe loose bed you can use gravel or gravel. They were supposed to pile up a layer of coarse gravel or gravel several centimeters thick, two to three centimeters thick. This allows more precise alignment and placement of concrete slabs. The best fixation is given when using mortar.

Share With Friends